Saving energy and pollution = Saving money

Example of colour change cost analysis

The following cost analysis has been made calculating the average cost for a  difficult cleaning operation (from black, blue, green, red and yellow  to neutral material – PE, PP, PVC, POM) in injection moulding.
The machines on which the cleaning operation had been carried out  had ranged from 60 to 1500 tons of clamping force.
The specific material in this case used for purging was Ultra Plast P-O.

 Medium Value

 Without Ultra Plast

With Ultra Plast

Kg of neutral material used

695

21

Cost (€/kg) of neutral material

1.10

1.10

Kg of Ultra Plast

--

11.3

Cost of Ultra Plast

--

9

Purging cost

765

124   (-83,7% of purging cost)

Time for purging (hour)

4.2

0.4

Down time- hour cost

220

220

Total cost of down time

924

88 (-90.5% of down time)

Total cost for purging

1689 €

213 €      (-87.4%)

 

As we can see in this table and in the chart below, with use of Ultra Plast we can save  87 % of costs  in the colour change.
It is very important that also the down time decreases, so we can save time and money in production cycle.

 
 